Table Formwork for Construction Concrete Poruing with Steel Floorprop or Scaffolding System

20 $

1 pcs

1.5 $

50

After-sales Service: Online Technical Support
Certification: ISO
Supplier Details

Product Details

Basic Info.

Model NO.
Table form
Length
3300~5000 mm
Width
2440~3600 mm
Thickness of Slab
100~500mm
Bearing Capacity
5~15kn/Square Meter
Auxiliary Equipment
Lifting Fork, Shifting Trolley
Certificate
SGS / ISO9001:2015
Application
Slab Pouring
Transport Package
Package Box, Steel Pallet, Steel Frame, Container
Specification
2440*4880mm, 3300*5000mm
Trademark
ZULIN
Origin
China
Production Capacity
15000 Square Meters/Month

Packaging & Delivery

Package Size
110.00cm * 110.00cm * 110.00cm
Package Gross Weight
480.000kg

Product Description

Product Description                                                                                                                                                                                                          

ZULIN modular table formwork 

 

The flexible and adaptable slab formwork

Table Formwork for Construction Concrete Poruing with Steel Floorprop or Scaffolding System

Introduction

 

Table formwork is widely used in the concrete pouring of slabs. The system is suitable for any ground plan and any floor height. It has simple structure, which makes it especially cost-effective.

 

Product Sketch

Table Formwork for Construction Concrete Poruing with Steel Floorprop or Scaffolding System

The Assembling Process


Table Formwork for Construction Concrete Poruing with Steel Floorprop or Scaffolding System

Edge and Infilling
Table Formwork for Construction Concrete Poruing with Steel Floorprop or Scaffolding SystemHandrail
Table Formwork for Construction Concrete Poruing with Steel Floorprop or Scaffolding SystemLifting Fork
Table Formwork for Construction Concrete Poruing with Steel Floorprop or Scaffolding System
Shifting Trolley

Shifting trolley is used to transport table formwork in horizontal direction.
Table Formwork for Construction Concrete Poruing with Steel Floorprop or Scaffolding System

Parameters

 

PARAMETERS
Length  3300~5000 mm
Width 2440~3600 mm
Thickness 250~300 mm
Bearing Capacity 7.8~9.1KN/square meter
Bearing Load of Lifting Fork 10~15 KN
Bearing Load of Shifting Trolley 11~20KN

 

Business process                                                                                                                                                                                                                                                 

Table Formwork for Construction Concrete Poruing with Steel Floorprop or Scaffolding System

 

Completed Projects                                                                                                                                                                                                                                                   
 

COMPLETED PROJECTS

Table Formwork for Construction Concrete Poruing with Steel Floorprop or Scaffolding System

Company Profile                                                                                                                                                                                                    

Table Formwork for Construction Concrete Poruing with Steel Floorprop or Scaffolding System

Beijing Zulin Formwork & Scaffolding Co.,Ltd is a leading company which develops, designs, manufactures, sells, and leases Formworks and Scaffoldings for construction projects in the field of civil and industrial engineering, roads and bridges, hydroelectric dams, nuclear power stations etc.

 

We are one of the pioneer companies which developed formwork and scaffolding in China. We have a team of dedicated and professional technical specialists which continuously improves our products offerings. The company have 2 excellent wooden beam production lines and 6 steel structure workshops.

 

With years of experiences in conducting our own research and development, we have gained recognition both in China and abroad based on our excellent techniques in this industry. We have won many intellectual properties, e.g. hydraulic auto-climbing formwork, Auto-climbing Protection Panel and many other types of formwork techniques.

 

We are constantly innovating in order to provide high quality products to our clients. As a result, we have received numerous compliments from our clients.

 

Beijing Zulin Formwork & Scaffolding Co.,Ltd is committed to our mission of striving for excellence and providing high quality products.We are dedicated to provide forward-moving technology, excellent products and services to both our existing and new clients.
Table Formwork for Construction Concrete Poruing with Steel Floorprop or Scaffolding System


FAQ                                                                                                                                                                                                                                                                          
Table Formwork for Construction Concrete Poruing with Steel Floorprop or Scaffolding System

Q1. What do you do? 

A: We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing, multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.

 

Q2. How many construction projects have you accomplished?

A: 600 both in China and abroad.

 

Q3. Have you accomplished any landmark?

A: Yes, we have. For example, PAFC (660 meters tall), The 21 Century Building, 2008 Beijing the Nest  Main   Stadium, CCTV New Site, Colombo Lotus Tower(Sri Lanka), Hong Kong-Zhuhai-Macau Bridge, Gezhouba Pubugou Hydropower Station etc.

 

Q4. What can you do for us?

A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.

B.We sell our products to the contractors, building companies, or trading companies

C.We support our worldwide peer companies with our outstanding formwork or scaffolding products.

D.We provide remote or on-site instruction to the builders.

 

Q5. What do you need in order to make a brief design and quotation when we have a construction project to be built?

A: Structural drawing and section drawing.

 

Q6. How long does it take to make a brief design and quotation after we offer the structural drawing?

A: In general, it takes 5~7 days based on specific requirements of construction project.

 

Q7. How long dose it take to manufacture the products after the signing of contract?

A: In general, it takes 30~60 days based on the type and quantity of products to be produced.

 

Q8. Are your products available for leasing?

A: Our products are available for leasing in Indonesia, Singapore, Dubai, Australia, New Zealand. It depends on local relevant regulations in other countries.

Specification

Packing & Delivery

FAQ